New 3D Metal Forming facility operational
3D Metal Forming’s new production facility went into full operation on July 7th, 2014.
The core of the new production facility is a waterbassin with 9 m. Diameter in which the High Energy Hydro Forming (HEHF) process takes place. A special process control system is designed and implemented for keeping vibrations and noise levels (far) below set thresholds.